Apartment EV Charging Station

The Case:

Performance Communications designed and installed 20 Level 2 chargers and 4 DC fast chargers (DCFC) at a large apartment complex for use by the public and staff. The charging stations operate flawlessly 24/7, showcasing high usage rates and supporting the complex’s commitment to sustainability and convenience for residents, visitors, and staff.

The Challenge:

The apartment complex required a reliable and efficient charging infrastructure to accommodate the growing demand for electric vehicles among residents and visitors. The solution needed to ensure continuous operation and high performance, even during peak usage times.

Our Solution:

Performance Communications engineered and installed a robust charging network consisting of 20 Level 2 chargers and 4 DC fast chargers (DCFC). This infrastructure was designed for resilience and capacity, ensuring uninterrupted service and high usage rates. The chargers operate flawlessly 24/7, providing convenience and supporting the complex’s sustainability goals. This installation enhances the living experience for residents and visitors, promoting eco-friendly transportation options and contributing to the complex’s commitment to environmental stewardship.

Electric vehicle charging station with cars.